Home
International Journal of Science and Research Archive
International, Peer reviewed, Open access Journal ISSN Approved Journal No. 2582-8185

Main navigation

  • Home
    • Journal Information
    • Abstracting and Indexing
    • Editorial Board Members
    • Reviewer Panel
    • Journal Policies
    • IJSRA CrossMark Policy
    • Publication Ethics
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Become a Reviewer panel member
    • Join as Editorial Board Member
  • Contact us
  • Downloads

ISSN Approved Journal || eISSN: 2582-8185 || CODEN: IJSRO2 || Impact Factor 8.2 || Google Scholar and CrossRef Indexed

Peer Reviewed and Referred Journal || Free Certificate of Publication

Research and review articles are invited for publication in March 2026 (Volume 18, Issue 3) Submit manuscript

Temporal analysis of project completion-a comparative study between Public-Private Partnership (PPP) and private sector in the energy infrastructure

Breadcrumb

  • Home
  • Temporal analysis of project completion-a comparative study between Public-Private Partnership (PPP) and private sector in the energy infrastructure

Vivek Jain * and Bhavana Likhitkar

Department of Management Studies, LNCT, Kolar Rd, Sarvadharam C Sector, Shirdipuram, Sarvadharam, Bhopal, Madhya Pradesh 462042, India.
 
Research Article
 
International Journal of Science and Research Archive, 2024, 11(01), 2419–2426.
Article DOI: 10.30574/ijsra.2024.11.1.0331
DOI url: https://doi.org/10.30574/ijsra.2024.11.1.0331
Received on 11 January 2024; revised on 18 February 2024; accepted on 21 February 2024
 
The present study conducted to understand the timeline dynamics associated with project completion in the context of Public-Private Partnership (PPP) and the Private Sector. It is commonly recognized that PPP projects typically exhibit long durations compared to similar projects undertaken by the private sector. Semi structured questionnaire survey was conducted to collect data from the Industry experts on PPP and Private Sector projects. Subsequent to careful data cleansing, the structured dataset underwent for statistical analyses. Our findings indicate that building PPP projects takes significantly more time compared to private sector projects. The results suggest to identify ways to speed up project delivery. It is found that using Blockchain Technology, especially Corda, can help track project progress easily, closing gaps and making projects faster.
 
Public Private Partnership (PPP); Energy Sector; Infrastructure projects; Block Chain
 
https://ijsra.net/sites/default/files/fulltext_pdf/IJSRA-2024-0331.pdf

Preview Article PDF

Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


All statements, opinions, and data contained in this publication are solely those of the individual author(s) and contributor(s). The journal, editors, reviewers, and publisher disclaim any responsibility or liability for the content, including accuracy, completeness, or any consequences arising from its use.

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details